Warehouse Energy Improvements
VA Medical Center – West Roxbury, MA

Alares Construction Inc. replaced the failed heating and lighting with a more efficient system. Work included removal of existing steam heat radiators and unit heaters, removal of fluorescent light fixtures and providing new steam to hot water heat exchanger, new hot water piping system, new hot water unit heaters, individual unit temperature controls, new Trane direct digital control of heat exchanger, Trane programming, seamless interface to the West Roxbury Tracer ES system, new electrical panel-board and new T-5 energy efficient lighting.

Self-Performed: Site Supervision, Plumbing & Electrical

Energy Improvement Project Work
Energy Improvement Project Work
Energy Improvement Project Work

Air Handler Replacement
VA Medical Center – West Roxbury, MA

Alares Construction Inc. removed and replaced two aging air handler units that served a critical function in maintaining constant air circulation and filtration to laboratory testing facilities. Alares Construction Inc. was able to design and implement a phasing scenario through the use of temporary air handlers that would eliminate the need to shut the laboratory down during installation; saving the VA thousands of dollars in outsourced testing. In addition to the AHUs, Alares Construction Inc. installed a 15 ton chiller to provide redundancy in the cooling system in the event of an outage at the main plant. All equipment was moved from primary power to emergency power, and new electrical feeds were run from the generator to the mechanical space. Alares Construction Inc. also coordinated rigging of the new machinery into the third floor of an active hospital.

Self-Performed: Site Supervision, Plumbing, Tin Knocking, Electrical & Painting

Energy Improvement Project Work
Energy Improvement Project Work
Energy Improvement Project Work

At Alares Construction Inc., quality control and project management
delivery systems ensure

Our Performance is Exemplary




Contractor assisted the VA with paperwork & Equipment data required to receive a utility incentive. The completed project improved heating control saving 8474 therms/year and qualifying for a $12,711 incentive.